Integrated Decision Making for Ground Handling Management
hierarchical structure, handling activities, management organization
Abstract
In this paper a hierarchical structure for the management of airport ground handling activities is proposed. The main decision making processes in charge of the managerial units composing a proposed ground handling management organization are considered. The global objective is to turn available the ground handling resources so that arriving and departing flight are serviced with as little delay as possible. Two operational situations are considered: a normal one where small delays are coped with when arriving and departing traffic is globally on schedule, and a disrupted situation where arriving or departing traffic suffer very large delays.
Downloads
How to Cite
References
Cosenza (2011) Cosenza, Giuseppe.
C Cosenza, F Mora-Camino (2011) Nombres et ensembles duaux flous et applications.
(2012) Complete Hematological Remission after Decitabine Treatment in a Patient with Congenital Agammaglobulinemia, FLT3- and TP53-Mutated Acute Myeloid Leukemia. 4(1).
C Cosenza, O Lenguerke, F Mora-Camino (2012) Fuzzy sets and dual numbers: an integrated approach. 81-86.
; Ploog, Ploog (2005) Disruption Management in Operation Control, m2p Consulting, Presentation.
Pdm (2012) The Aena, Palma de Mallorca Airport.
; Pestana, Pestana Barros (2008) Technical change and productivity growth in airports: A case study. 42(5), 818-832.
Georgina Santos, Maël Robin (2010) Determinants of delays at European airports. 44(3), 392-403.
R Tanger, E Tanger, Clayton (2013) Booz & company's London and Kuala Lumpur offices. Managing Airport Disruption: Achieving Resilience through Collaboration.
Published
2015-02-06
Issue
Section
License
Copyright (c) 2015 Authors and Global Journals Private Limited

This work is licensed under a Creative Commons Attribution 4.0 International License.